📋
Basic Information
Model NO.NACS TO CCS1
InterfacesOne Pile with Multiple Charges
LocationPrivate Use
InstallationFloor Type
Charge MethodQuick Charge
QualificationUKCA, RoHS, CE, FCC
Transport PackageWooden Case
Specification350*350*10mm
❓
Frequently Asked Questions
How do I start a charging session?
You can start charging via APP, RFID card, QR code scan, or credit card payment, depending on the specific configuration of the charging pile.
How long does it take to charge an EV with this system?
For DC fast charging, it typically takes 30–60 minutes to charge from 20% to 80% battery level. AC charging may take 6–10 hours for a full charge.
Can the charging pile operate in extreme weather?
Yes, our units feature an IP67 protection rating (as well as IP54/IP55 versions), making them waterproof and dustproof for safe outdoor use in rain, snow, and high humidity.
What safety protections are built into the hardware?
The system includes comprehensive protection: over-voltage, under-voltage, overcurrent, leakage, overheating, lightning protection, and short-circuit protection.
What happens if there is a power outage during use?
The charging pile will automatically stop and cut power for safety. Once power is restored, it will resume the charging process from the point of interruption.
Does the product meet international safety standards?
Yes, our products are certified with CE, FCC, RoHS, and UKCA, ensuring they meet rigorous regional safety and electrical standards.