Fast Charging 120kw DC Dual Port EV Charging Station for All Vehicles

Still deciding? Get samples of $ !
Order Sample

Product Description

📋

Basic Specifications

Model NO.
MECS-120-Y2-D3
Rated Power
120kw
Charging Interfaces
Multiple Charges
Charging Guns
Two Guns
Start Mode
RFID, Mobile App, Credit Card, Ethernet/4G
Display
7-Inch Touch Screen
Output Voltage
200V-1000V
Environment
Indoor/Outdoor (IP54)
Efficiency
>95.0%
Power Factor
>0.99

Feature Introduction

DC Dual Port EV Charging Station

New generation integrated DC fast charging pile for electric vehicles. The module adopts an isolated air channel potting design, ensuring high reliability.

System compatibility with 160kW/120kW/80kW power configurations, meeting the charging needs of various vehicles. Suitable for convention centers, shopping malls, large parking lots, and amusement parks.

🚀 Powerful Performance

  • Charging efficiency up to 95%.
  • Excellent power quality and low output ripple.
  • Ultra-low operating losses and standby power consumption.
⚙️

Technical Parameters

Product NameSmart DC charging pile
Product ModelMECS-120-Y2-D3
Input VoltageThree-phase five-wire AC input, 380VAC ± 15%
Output Maximum Power120kW
Output Voltage Range200V-1000V (constant power 300V-1000V)
Output Maximum Current250A*2
Operating Temperature-30 to +70°C
Storage Temperature-40 to +75°C
Operating Humidity0~95%
Operating Altitude≤ 2000 meters
Heat DissipationIntelligent air cooling
Product Size1900*700*700mm
📸

Product Display

EV Charging Station View 1
EV Charging Station View 2
EV Charging Station View 3
EV Charging Station View 4
🛡️ Safe and Reliable

High protection design, anti-rain and snow, wind-proof sand, salt spray and anti-condensation. 7-inch capacitive screen with front door windproof design.

💎 Quality Assurance

Perfect product research and development quality system standards. All devices are selected from international and domestic first-class brands. Strict EMC and temperature testing.

Detailed Feature 1
Detailed Feature 2
Detailed Feature 3
Detailed Feature 4

Frequently Asked Questions

Q1: Are you a trading company or manufacturer?
A1: We are a professional factory with 19 years experience in the field of High and low Voltage switch gear, Substation, transformers, and electric vehicle charging stations.
Q2: What is the payment term?
A2: 30% T/T in advance, 70% before shipment. West Union and L/C are also acceptable.
Q3: How about the delivery time?
A3: Usually it will take about 15-20 days.
Q4: How do you solve quality problems?
A4: Please provide detailed photos of quality problems. Our technical and quality testing department will analyze and provide a satisfied solution within 2 days.
Q5: What is the warranty time?
A5: Within 12 months from the date of the bill of lading.
Q6: Do you accept product customization?
A6: Yes. Please provide specific drawings or parameters, and we will quote you after evaluation.

Related Products